learn it in time

May 30 [Wed], 2012, 16:39
for adidas wings CRH380B bogie, we have done nine kinds of components in case of failure to monitor the operation. For example let bogie spring break, and train 300 kilometers per hour is still under the safe parking.

Beijing News: High-speed rail as fast, or how to avoid rear-end collision?

Chang Chun Chen: CRH380B train network control system (TCN system) in line with European standards, the system with constant speed control system with the body, there will be no guarantee that the vehicles rear-end collision occurred, and can reach very high Punctuality.

Beijing  Jeremy Scott Wings 2.0 News: If the high speed train, the tracks were destroyed in front of a certain period, or have been destroyed, train how to learn it in time?

Chang Chun Chen: Timely monitoring of the vehicle monitoring system of rail lines. Power high-speed rail track is, once the track was artificially damaged or destroyed by landslides, will be off the track, the train can be detected in advance, and avoid parking. CRH380B car also installed a device that can monitor the body lateral vibration acceleration to prevent derailment.

Beijing News: Qingdao four companies said the designer, the international high-speed rail safety indicators for the derailment coefficient, CRH380A derailment coefficient is less than 0. 13, well below the 0. 8 GB. How to see this data ken griffey shoes ?
プロフィール
  • プロフィール画像
  • アイコン画像 ニックネーム:binbanh317
読者になる
2012年05月
« 前の月  |  次の月 »
1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30 31
最新コメント
ヤプミー!一覧
読者になる
P R
カテゴリアーカイブ
月別アーカイブ
http://yaplog.jp/binbanh317/index1_0.rdf